Lancy Tennis Club
Lancy Tennis Club

June 2018 – 2’000 m3 retention basin at the Tennis Club of Lancy

Retention basin to store 2’020 m3 of water in case…

LEB 51

March 2018 – Clearwater tunnel at the LEB construction site in Lausanne

Lausanne, LEB site: Field welding and installation of a Ø…

VD1700431_03

Décembre 2017 – Bassin de rétention à Moillesullaz / GE

Livraison et pose d’un bassin de rétention de 450 m3 à…

Cuve 46000 litres 83
Cuve 46000 litres 80

November 2017 – Holding tank 46’000 liters in Grand-Saconnex, Geneva

Holding tank 46’000 liters, length 12 meters, diameter 2.50 meters…

Hedingen 11m3 ZH1700420 02
Hedingen 11m3 ZH1700420 02

November 2017 – 11 M3 retention pit at Hedingen / ZH

Production and delivery of an 11 M3 retention pit at…

Le Châble 1600

October 2017 – Replacement of Ø 800 mm pipe at Le Châble

Replacement of Ø 800 mm pipe at Le Châble /VS,…

Ventilation Moudon 1200 03
Ventilation Moudon 1200 03

Septembre 2017 – Ventilation Ø 710 mm à Moudon

Exécution d’une ventilation en HDPE Ø 710 mm à la…

Bassin de rétention Steinhausen

Septembre 2015 – Bassin de rétention à Steinhausen

Installation d’un bassin de rétention de 60 m3 en HDPE…

Wastop Hirschtal
Wastop Hirschtal

Octobre 2014 – Livraison d’un clapet anti-refoulement à Hirschtal

Livraison d’un clapet anti-refoulement Wastop© Ø 1200 mm, poids 290…