March 2018 – Clearwater tunnel at the LEB construction site in Lausanne

Lausanne, LEB site: Field welding and installation of a Ø 630 mm HD-PE pipe, length 120 M ‘, in the micro-tunnel for clear water.

  • CLIENT Marti SA
  • ANNÉE 2018