NEWS

Saturday, 28 April 2018 / Published in CANPLAST, NEWS
Downstream 92

The operation of the Downstream Defender®, advanced vortex separator of Hydro International proposed by Canplast SA https://lnkd.in/eGxSYDp

Wednesday, 28 March 2018 / Published in CANPLAST, NEWS
Micro Tunnel LEB 80

Lausanne, LEB site: Field welding and installation of a Ø 630 mm HD-PE pipe, length 120 M ‘, in the micro-tunnel for clear water.


<!-- Lausanne LEB Lausanne LEB -->

Wednesday, 15 November 2017 / Published in CANPLAST, NEWS
cuve 46000 litres 01

Holding tank 46’000 liters, length 12 meters, diameter 2.50 meters in Grand-Saconnex, Geneva

Cuve 46000 litres Cuve 46000 litres
Wednesday, 15 November 2017 / Published in CANPLAST, NEWS
Hedingen 11m3 ZH1700420

Production and delivery of an 11 M3 retention pit at Haldenrebenstrasse 3 Hedingen / ZH

Hedingen 11m3 ZH1700420

Wednesday, 13 September 2017 / Published in CANPLAST, NEWS
Ventilation Moudon 1200

Completion of a HDPE Ø710 mm ventilation at the fitness center OFSPO of the AISMLE in Moudon.
Length 210 M ‘, in 16 parts, 135 connections with wall collar system sealing joints.

Canadian well PEHD Canadian well PEHD
TOP