Typical stormwater runoff, placed on a unitary system pipe system, makes it possible to discharge all the water to the treatment plant in dry weather. In case of heavy rain or thunderstorms, the surplus is evacuated to a watercourse. Prefabrication in the manufacture workshop generally reduces the size of the structure and the time required for the company to work on the site.